Belza Ecotech
Plant & sustainability
The Ben Guerir factory
Latest-generation industrial equipment, including the 3rd Color Mix technology machine installed in Morocco.
The plant
From raw material to delivery
- 01 Raw material
- 02 Processing
- 03 Dedicated machines
- 04 Testing
- 05 Laboratory
- 06 Drying
- 07 Storage for delivery
-
The Ben Guerir factory -
Aggregate stocks -
Silo and feed hoppers -
Production line -
Pallet strapping -
Strapped pallets of hollow blocks
Laboratory
The group laboratory
The group’s in-house laboratory checks the conformity of the concrete products made by Belza Préfa and Belza Ecotech. At Belza Ecotech, production goes through its tests before drying.
It is equipped with a compression press, a flexural test frame, precision scales and a set of sieves.
-
Overview of the laboratory -
Kerb on the flexural test frame -
Failure after the flexural test
Sustainability
Eco-responsible approach
Environmentally friendly products.
-
Water clarifier
And water recycling.
-
Water ponds
-
Solar energy
Solar panels.
-
Recycling of used oils
Quotes
Let’s talk about your project
A quote request or another question: one form.
- You describe your needs: product, quantity, site region, lead time.
- The request goes to Belza Ecotech, which reviews it.
- Its teams get back to you with an answer or a quote.